Protests & ClaimsProtests & Claims
ArchiveProtests & Claims
19,904 articles from the Protests & Claims Brief.

Articles

🔒 Members Only · Protests & Claims BriefYou’ve reached the member portion of this brief.Members read the full analysis and the source documents in every Brief, six days a week.
SBA Plans to Consolidate All Small and 8(a) Mentor-Protégé Programs
The End is Near: DCAA Projects End of Incurred Cost Backlog by FY 2018
DPAP Issues Class Deviation Increasing Threshold for Obtaining Certified Cost or Pricing
Proposed Rule Would Alter DoD, NASA Requirements for Cost or Pricing Data
Two-Minute Warning – If You Mean Optional, Say Optional
Agency Failed to Consider Proposed Efficiencies Before Making Upward Cost Adjustment; GAO B-415944, Trident Vantage Systems, LLC; SKER-SGT Engineering & Science, LLC
Board Lacks Jurisdiction to Consider Quantum Meruit Claims Absent Government Allegation that Contact is Void Ab Initio; ASBCA Nos. 61161, Appeals of PROTEC GmbH
Appellant Cannot Use Excusable Delay to Defend Against Liquidated Damages Without First Submitting Claim for Time Extensions; ASBCA No. 61279, Appeal of OCCI Inc.
A Bridge Too Far — Court of Federal Claims Sustains Protest of Fifth (Yes, Fifth) Sole-Source Bridge Contract Awarded to Incumbent During Protracted Bid Protest Litigation
May 2018 Bid Protest Roundup
SBA Eliminates “Direct” Ownership Rules for HUBZone Program
Army Incurred Costly Delays on Construction of Texas Hospital
GAO Unravels Tangled Data Rights Challenge to Air Force Helicopter Procurement; GAO B-416027, Sikorsky Aircraft Corporation
Difference in Descriptive Language Does Not Render Appeal Materially Different Than Original Claim to Agency; CBCA 5907, Walker Development & Trading Group Inc. v. Department of Veterans Affairs
Protester Responsible for Failure to Submit Comments on Agency Report; GAO B-415295.4, Wolverton Property Management, LLC—Reconsideration
Unreasonableness And Lack Of Documentation (Post-Award Protest Primer #17)
Let’s Replace SBA Small Business Goaling Grades with Participation Trophies
Fastest 5 Minutes, The Podcast Gov’t Contractors Can’t Do Without (June 8)
Protester Had No Reason to Delay Challenge to Legality of Award Term Extensions After Agency Announced Them; COFC No. 17-1970C, CBE Group Inc. v United States and Pioneer Credit Recover Inc., et al
Keep reading


